Trending



Lagos Hospital Lift Remains Inoperative Three Years After Doctor’s Death

lagos hospital lift crash doctor site - general hospital odan building
Written byHealthCoach AfricaEditorial team
Last updated 28 September 2026How we write and check this information

LAGOS, NIGERIA — Driving the lagos hospital lift crash doctor narrative, a replaced elevator at the General Hospital, Odan, Lagos Island, remains non-operational three years after a fatal drop claimed the life of a young medical practitioner.

Dr. Vwaere Diaso died on August 1, 2023, when an elevator crashed at the 10-storey House Officers’ Residence. Her death triggered public outcry and nationwide medical strikes over poor public health infrastructure. Premium Times reported on September 25, 2026, that while elevator installation is complete, civil rehabilitation works across the building remain unfinished, forcing resident doctors to continue climbing up to ten flights of stairs daily.

Lagos State Health Commissioner Akin Abayomi stated that the state remains committed to safety and preventing future tragedies by enforcing Lagos State Safety Commission guidelines for lift operations. However, project delays have pushed the rehabilitation schedule far beyond its original timeline.

Timeline of the Odan Hospital Residence Project

The rehabilitation schedule for the 10-storey residence has faced significant timeline overruns since construction began:

Milestone Phase Planned / Actual Schedule Status & Operational Details
Initial Elevator Crash August 1, 2023 Tragic crash results in death of Dr. Vwaere Diaso
Project Commencement April 2024 Contract awarded to Julius Berger with a 36-week schedule
Original Target Deadline January 2025 Target missed; construction slowed by water seepage
Upper Floors Completed February 2026 Renovation finalized for 10th, 9th, 8th, and 7th floors
Mid-Level Renovation September 2026 Ongoing work on 6th, 5th, and 4th floors; elevator remains idle

Workplace Infrastructure and Brain Drain Pressures

Medical union representatives, including Charles Aisudo, Secretary of the Medical Guild, confirmed that the elevator installation is complete but cannot be activated until phased building renovations conclude. The delay highlights systemic issues in public sector infrastructure management, where funding tranches and contractor payment lags frequently disrupt construction schedules.

The persistent infrastructure breakdown at General Hospital Odan reflects broader grievances among Nigerian health personnel over working conditions, long shift hours, and inadequate safety standards. Substandard staff housing and institutional delays contribute directly to the accelerated emigration of medical professionals to the UK, North America, and the Middle East.

Why It Matters: Prolonged infrastructure failures and unsafe housing for young doctors feed professional frustration, driving Nigeria’s healthcare workforce to emigrate.

Source: Premium Times Nigeria, September 25, 2026

Please follow and like us:

Leave a Reply

Your email address will not be published. Required fields are marked *